Capacity planning helps teams act before users experience resource exhaustion. A useful forecast combines traffic trends with the resource cost of serving that traffic.
Establish a baseline
Measure request volume, concurrency, CPU, memory, database connections, storage growth, queue throughput, and external provider limits. Segment by workload type because not all requests consume equal resources.
Model scenarios
Estimate expected, peak, and exceptional growth. Include planned launches, seasonal demand, data accumulation, and changes in request mix. Identify the first resource likely to saturate.
Validate assumptions
Load tests and production observations should refine the forecast. Capacity is not a single fixed number: caching, query efficiency, and dependency limits can change the relationship between traffic and resource use.
Define action thresholds
Set points for scaling, optimization, or workload shedding. Include lead time for purchasing capacity or changing architecture.
Checklist
- Track workload-specific resource consumption.
- Forecast expected and peak scenarios.
- Identify the first likely saturation point.
- Validate with load tests and real traffic.
- Define thresholds and lead times for action.